Production capacity – 300-400 t/month.
Production area – 3 800 m²
Bridge Cranes 5 units 5 t each, two crane 16 t
Tower Crane – 6 t, Service Zone – 45 m
Sandblasting Camera – 15 m x 3 m (metal grit)
Paint Shop 2 units. – 600 m² and 800 m²
Internal Rail track system – 450 m
Storing area – 4 000 m²
Under Construction:
New production area 4000 m2
Bridge cranes: 2 pcs. 35 t/each, 2 pcs. 5 t/each = total lifting capacity 70 t
New sandblasting chamber